The Map below shows the progress on the trail building work at The Preserve during 2021
The sections shown in red are 655 yards of new built-from-scratch trail and are described by the captions on the left side of the page. These are almost all of the new trail route called for in the Trail Design Plan.
The sections shown in yellow are the 604 yards of pre-existing trail. These sections will be brought into compliance with the standards defined in the Trail Design Plan. These sections are described in the captions down the right side of the page. We expect this work will be completed in 2022 over the course of 9 to 11 working weekends.
The sections shown in Purple require no further work.
The section shown in white is a section of bog bridging that we expect to contract for separately